Delivered at national scale — from a 4.8 MWp utility solar plant in the southern desert to a 105,000-unit LED street-lighting programme across northern Jordan.
4.8 MWp Utility-Scale PV System
Al-Qatrana · South of JordanRunning gas turbines means ongoing, unpredictable costs tied to volatile global fuel markets and potential carbon taxes. Solar carries a higher initial investment but minimal, predictable operating and maintenance costs — its "fuel," sunlight, is free.
In 2016, Marriott and Sheraton International Hotels set out to cut energy consumption and bring the environmental impact of their electric power need to zero — saving an estimated 10.7 million kilograms of CO₂ emissions per year. National Electrical Industries took a sub-contract agreement with Millennium Energy Industries to carry out the installation work.
- ⚡4.8 MWp capacityUtility-scale ground-mount photovoltaic plant.
- 🏨Marriott & Sheraton HotelsOff-take partners targeting net-zero power impact.
- 🤝Millennium Energy IndustriesNEI as installation sub-contractor (2016).
- 🌱10.7M kg CO₂ / yearEstimated annual emissions avoided.
105,000-Unit LED Street Lighting
Jarash · Ajloun · Al-Mafraq · North of JordanTraditional street-lighting consumes a great deal of energy, runs at low efficiency and has a short lifecycle. In 2023, the Ministry of Energy and Mineral Resources signed an agreement with National Electrical Industries to supply, install and maintain 105,000 LED street-lighting units across Jarash, Ajloun and Al-Mafraq — replacing the legacy fixtures entirely.
The programme was planned and tracked through detailed GIS mapping — clustering installed counts by area and recording every pole at the individual-fixture level, including the wattage class of each unit.
- 🏛️Ministry of Energy & Mineral ResourcesClient and project authority (2023).
- 💡105,000 LED unitsSupply, installation and maintenance scope.
- 📍Jarash · Ajloun · Al-MafraqThree northern governorates, fully replaced.
- 🗺️GIS-managed rolloutCluster and pole-level tracking with wattage classes.
Deployment overview — installed-unit clusters across the project area.